CMS HCAL Trigger/Readout System
Other HCAL TriDAS pages
VNC
Linux HTR software
Histogram Firmware
Hardware
TI deserializers:
TLK2501
(1.6-2.5 Gbaud)
TLK1501
(0.8-1.5 Gbaud)
Current totalling of UMD invoices to FNAL (
xls
)
Tullio's Clock Diagram
Conceptual design of
readout crate
Schematic
of HCAL Trigger/Readout (
HTR
) cards
Presentation
for June 1996 FERU workshop at CERN
1999/2000 timeline
for HTR demonstrator card (pdf file)
Nov 1999 TRIDAS presentation in
HTML
(where you can get the PowerPoint slides too) or
PDF
Conceptual Design Report: (1.2M
PS file
or 0.3M
PDF
file)
Dec 13th Maryland Meeting -
blackboard PDF file
Latest
MS project
file (Feb 16, 2000)
Project Spreadsheet
overal cost, channels, cards, assorted M&S, and labor (updated Sept 7, 2001).
WBS baseline costing and accounting
Latest
spreadsheet
for Trigger/DAQ (as of Dec 2000)
Latest
summary
of items spent according to WBS
WBS
spreadsheet for keeping track of UMD Trigger/DAQ costs (and more)
Presentations (PDF) for the Feb 2000 FSU meeting:
readout system
functional
presentation
WBS walkthrough
(powerpoint file)
WBS dictionary
spreadsheet
May 10, 2000
TriDAS TPG overview (
ppt
and
pdf
slides)
Synchronization overview (
ppt
and
pdf
slides)
September 2000 Cern and October 2000 FNAL Update (
ppt
and
pdf
)
November 2000 Cern TRIDAS update (
ppt
and
pdf
)
Feb 2001 CMS/HCAL Texas Tech meeting (
ppt
and
pdf
)
Apr 2001 CMS/HCAL Boston meeting (
ppt
and
pdf
)
Cost estimate
which came out of that meeting.
May 2001
Timeline
July 2001 cost estimate (
ppt
)
Rochester 2001 meeting (
ppt
or
pdf
)
CERN CMS Week Dec 2001 (
ppt
or
pdf
)
Firt pass
(ppt file)
on Tracker Optical Link alternative.
CERN CMS Week Mar 2002 (
ppt
or
pdf
)
CMS ESSC Review (
ppt
or
pdf
)
June 2002 Lehman Review (
ppt
or
pdf
)
Backup technical slides (
ppt
or
pdf
)
CERN CMS Week June 2002 (
ppt
or
pdf
)
October 2002
MSWord file
of FY 2003 budget estimate
Lehman Reviews
Baseline review, April 11, 2000 (
ppt
and
pdf
)
Lehman review May 9, 2001 (
ppt
and
pdf
)
Last updated 13-May-2003
Drew Baden