T/DAQ Cost Calculation

The cost for Lehman00 ("Baseline") was based on the following numbers: The following table summarizes the baseline costs:
 
Item 
Num
Spares Total Num Unit Cost Total Cost
Comments
HTR
419
42
463
$2.5k
$1.16M
 
TPG Cables
531
27
558
$131
$74k
2 chan/TPG, some question as to safety requirements of cables, 
might be a lot less...needs followup.  Also no cables for HO
VME Crates
30
0
30
$5.5k
$165k
half-detector quickie calculation
VME Racks
11
0
11
$3.0k
$33k
3 crates/rack per half-detector
DCC
30
5
35
$7.8k
$273k
1/crate
HRC
30
5
35
$6.5k
$228k
1/crate
TOTAL
       
$1.93M
 

Since then, the following has changed:
 

  1. HTR costs have gone up due to not having properly taken into account optical/electrical transducers.
  2. HTR count
  3. TPG cables
  4. DCC cost has been reduced due to cost scrubbing, mostly of LRB but in general
  5. HRC cost has been reduced due to reduction in scope
  6. VME crate and rack count has been more accurately determined

  7.  
    Item
    "Fast/Dense"  "Baseline-like"  "Fast/Sparse" "Easiest"   Baseline 
    Chan/fiber
    3
    2
    3
    2
    2
    Frame rate (MHz)
    80
    40
    80
    40
    40
    Fiber/HTR
    12
    16
    8
    12
    16
    Chan/HTR
    36
    32
    24
    24
    32
    HTR uit cost ($k)
    $2.7
    $2.9
    $2.1
    $2.6
    $2.5
    DCC unit cost
    $5.0
    $5.0
    $5.0
    $5.0
    $7.8
    HRC unit cost
    $5.0
    $5.0
    $5.0
    $5.0
    $6.5
    HTR total cost ($M)
    $1.12
    $1.33
    $1.30
    $1.58
    $1.16
    HB crates: HTR/crate
    18
    16
    18
    18
    16
                    Channels/crate
    648
     512
    432
    432
    512
    HO crate:  HTR/crate
    16
    18
    16
    16
    18
                    Channels/crate
    546
    576
    384
    384
    576
    HE crates:  HTR/crate
    18
    15
    16
    16
    15
                    Channels/crate
    648
    480
    384
    384
    480
    HF crates:  HTR/crate
    17
    13
    17
    17
    13
                    Channels/crate
    612
    416
    408
    408
    416
    Total crates (HB,HO,HE,HF)
     (8,4,6,4)  22
     (10,4,8,6) 28
       (12,6,10,6) 34
        (12,6,10,6) 34
        (10,4,8,6) 28
    Total HTR cost ($M)
    $1.12
    $1.33
    $1.30
    $1.58
    $1.16
    VME total cost ($k)
    $148
    $187
    $223
    $223
    $198
    DCC+HRC total cost ($k) 
    $260
    $330
    $400
    $400
    $501
    TPG cable total cost ($k)
    $96
    $96
    $96
    $96
    $73
    TOTAL COST ($M)
      $1.62
      $1.94
      $2.02
      $2.30
    $1.93
    Additional cost due to loading
    $94
    $26
    $0
    $0
     
    GRAND TOTAL ($M)
    $1.71
    $1.97
    $2.02
    $2.30
    $1.93

    Comments: