Status of RBX Integration by Pawel de Barbaro Dec 2001 Readout Integration by Jim Freeman Dec 2001 Winter US CMS HCAL Meeting at FIT (first announcement, Dec 2001)
Talks:
Iowa LED System for CMS HCAL by Yasar Onel et al
HF-Fiber and PMT Purchases by Yasar Onel
CMS HF PMT System by Yasar Onel
Test of CMS_HF Light Guide System at Iowa PMT Test Station by Yasar Onel
et al
HCAL Front End Electronics:
FE Status and
Test Beam - Front End by Theresa M. Shaw
Wire Source Report by Alvin T. Laasanen
HCAL Data Concentrator Status Report by Eric Hazen
pdf,
ppt
The CMS HF Front-end Status Report by Eric Hazen
pdf,
ppt
Talk given at OOty:
HCAL Status by Jim Freeman pdf, ppt Talk given at Santa Barbara by A. Skuja (2003):
CMS HCAL Report ppt CMS HCAL Report (Long) ppt Talks at BNL by A. Skuja (2003):
CMS HCAL Report ppt HCAL Breakout Talk ppt Talk at Dubna by A. Skuja (2003):